Tutt Bryant

Case Study - Moving spools

LocationAustralia
StartFeb 2015
FinishMar 2015
ValueN/A
Related Items

Subsea 7, a leading international provider of seabed-to-surface engineering construction and services to the offshore industry contracted Tutt Bryant to undertake heavy lift crane and load-out of subsea spools on the Chevron operated Gorgon Project.

The scope of work undertaken by Tutt Bryant included the receipt of spool data, proposal of optimal crane configurations to match the fabrication yard and wharf layout and production of crane lift study engineering data.

Terex-Demag CC8800-1 setup and ready for its lifts
Terex-Demag CC8800-1 setup and ready for its lifts
Trial lift of spool data ensuring trouble free subsea installation
Trial lift of spool data ensuring trouble free subsea installation
Load out of subsea spool and lifting aid onto barge
Load out of subsea spool and lifting aid onto barge