Australian Marine Complex – Transportation of Svitzer Koona & Karoo

- Scope
Produce transportation plans and associated engineering calculations to relocate Svitzer Koona & Karoo. - Challenges
Specific guidelines as to where the Svitzer Koona & Karoo needed to be transported. With short time frame for preparation and execution. - Solution
Utilise the self-propelled modular trailers (SPMT) with double 18 axle lines and two power-pack configuration
TUTT BRYANT HEAVY LIFT & SHIFT ALWAYS DELIVER
Australian Marine Complex contracted Tutt Bryant Heavy Lift & Shift to transport Svitzer Koona & Karoo, weighing 665 tons, from the floating dock (barge) ‘YARGAN’ to the temporary maintenance area behind the Australian Marine Complex building 1. The load of the freight was 580 tons plus an additional 85 tons supporting load structures comprised of 6 docking cradle arrangements.
Tutt Bryant Heavy Lift & Shift successfully completed the transportation of the Svitzer Koona & Karoo. Utilising the self-propelled modular trailers (SPMT) with double 18 axle lines and two power-pack configuration. The location of SPMT was placed based on the design of the docking cradles.
BumSoo Park (pictured above) completed his first official transportation project as a Trainee Engineer, under the guidance of the experienced team.
Equipment Solution
SCHEURLE 3RD GENERATION SPMT – Double 18 axle lines